JPDA PRODUCTION

JPDA: Monthly Production
Barrels of Oil Equivalent (BOE)

Previous 3 months

MonthProduction (BOE)
Aug '24137,419.59
Sep '2451,305.98
Oct '240

Autoridade Nacional do Petróleo

LAFAEK, Well Description

Well: Jahal-1/Jahal01/ST1

click for full map


Region:

JPDA

Contact Area:

JPDA 06-105

Field Name:




Well Type:

Exploration

Classification:

Oil - Abandoned



Total depth (m):

3440

RKB (m):

25

Seabed (m):

402.3

Start:

22-April-96

Finish:

09-May-96

Well Data (release):

08/09/1998 11:00:00 PM

Status:

Draft


JAHAL-1

Operator NameBHP Petroleum (ZOC-1A) Inc.
JV Participating Interest-
Well nameJAHAL-1 & JAHAL-1/ST1
Fact map link-
Well PermitZOCA 91-01, Bonaparte
Well Type-
Well Objectives-
Offset Wells-
Coordinate SystemAMG Zone 52, C.M 129º E
Geodetic DatumAGD 84
Location Latitude : 10° 34’ 08.023” S
Longitude : 126° 06’ 41.243” E
UTM Easting (m): 183 867.84
UTM Northing (m) 830 220.78
Rig NameOcean Bounty
Rig TypeSemi-submersible
Rotary Table 25.00 m
Water Depth402.30m
Spud Date23 April 1996
Date Reached TD06 May 1996
Total Depth 3.440mMD (3438.81 mTVD, )
Total Drilling Days-
StatusAbandoned
Rig Release Date 3 June 1996

WELL SUMMARY

The Semi-submersible MODU Ocean Bounty commenced the rig move from Bayu-3 at 10:30hrs on 21st April 1996, and arrived on location at Jahal-1 on 22 nd April 1996. A second approach to the Jahal-1 location was required as the rig drifted too far of line on the first attempt. Anchors were run. A Kenter link on anchor number 4 parted and was rejoined on the rig.

Jahal-1 was spudded on 23 rd April 1996 (the sea floor was tagged at 427.3m). The 36 in hole was drilled with a 12.25 in pilot bit/36 in Kvernex heleopener combination. The hole inclination at TD (467m) was 2.0 with MWD survey and 1.25º Totco survey. The 20 in/30in casing and PGB were run and cemented at 465m. The rig was repositioned to hold the PGB angles to 1.5º port and 1.75º port/fwd while WOC. Upon repositioning the rig, the PGB angles were 1.75º port and 2.0º port/fwd. While drilling the 17.5 in wellhead was run and cemented at 1040.31m. The BOP stack was run and tested.

The cement plug was set in the 8.5 in hole section from 3355m to 3250m. a kick-off cement plug was set from 2900m to 2770m. The hole was displaced back to 1.055G SBM and the hole was sidetracked to 20º inclination at an azimuth of 190º. The sidetrack section was drilled to core point at 3303m MD using two steel tooth bits, one PDC and one TCI all run PDMs.

The well plugged and abandoned. Anchors were pulled and the rig was released at 02.30hrs on 3rd june 1996.

SAMPLES, SIDEWALL, CORES, CONVENTIONAL CORES.

Cuttings

Collection Interval (mRT)
Treatment
Jahal-1: 1040-3440 (TD)

Jahal-1/ST1: 2780-3445 (TD)

    - 7 sets washed & dried
    - 1 set unwashed


Sidewall cores
CST:
Suite Run Bullets Depth from (mRT)Depth to (mRT)No lostNo Empty No. rec
26603425.02785.09645
No Sidewall cores were taken for Jahal-1/ST1.

MSCT:

Jahal-1:

Suite
Run
Bullets
Depth from (mRT)
Depth to (mRT)
No lost
No. rec
2
5
24
3261.8
3418.0
2
22

Conventional Cores

No Conventional cores were cut for Jahal-1

Jahal-1/ST1

Core No.
Collection Interval (mRT)
Recovery (m)
Recovery (%)
1
3303.0-3319.0
15.5
97.0
2
3319.0- 3328.1
9.1
100.0
3
3328.1- 3383.0
54.9
100.0

LOGGING AND SURVEYS

Mudlogging/Measurement while Drilling

Wireline Logs

Jahal-1:

Suite No
Run No
Log Type
Interval
(mRT)
Date
1
1
GR-SDT-CAL-DLL-AMS-SP
2762-415
01-05-96
1
1
AMS
2762-415
01-05-96
2
1
DIL-SDT-CAL-GR-AMS-SP
3443.8-2760
06-05-96
    2
1
    AMS
3443.8-276006-05-96
    2
2
    LDLP-CNL-NGS-AMS
3438.7-276006-05-96
    2
3
    CSAT(CHECKSHOT)
3440-221007-05-96
    2
4
    HP-RFT-GR-AMS
3413-3302.507-05-96
    2
5
    MSCT-GR
3418-3261.807-05-96
    2
6
    CST-GR
3425-278508-05-96
    2
7
    FMI-GR-AMS
3438-288009-05-96

Jahal-1/ ST1:

    Suite No
Run No Log TypeInterval
(mRT)
Date
    3
1
PI-AS-GR-CAL-AMS 3444.4-276020-05-96
    3
1
    LDL-CNL-GR-AM
3444.4-276020-05-96
    3
1
    AMS-GPIT
3444.4-276020-05-96
    3
2
    MDT-GR
3394.4-330121-05-96
    3
3
    UBI-GR
3408-276021-05-96

Processed Logs

Jahal-1

Suite No.
Run No.
Log Type
Interval (mRT)
Date
2
7
MSD-CYBDIP
3438-2880
08-05-96

FORMATION TESTING

RFT/MDT

Jahal-1:

Run
Tool
No. Pretests
Interval (mRT)
Comments
1
RFT
18
3302.5-3413
- 6 good test

- 3 supercharged

- 9 tight

Jahal-1/ST1:

Run
Tool
No. Pretests
Interval (mRT)
Comments
1
MDT
30
3114-3394.4
- 9 good test

- 4 supercharged

- 12 tight

- 5 lost seals


DST

Jahal-1/ST-1

Run
Interval (mRT)
Rates
Choke Size (in)
Well Head Pressure (psig)
1
3300-3315
Gas: 90.0 Mscf/d

Oil: 1422.0 stb/d

0.3750
n/a









This page was last updated on 26 June, 2014 For website matters contact us

Disclaimer: ANPM reserves its copyright for materials articles/news (text, photographs, and logos) contained in this entire website.