The BU-D05 / BU-D05ST1 development well was drilled from the BU-DPP platform by the Ensco 104 jackup rig. BU-DPP is located in the western half of the Bayu-Undan gas condensate field which is in the Production Sharing Contract (PSC) areas of JPDA 03-12 and JPDA 03-13, North Bonaparte Basin, Timor Sea, offshore Northwest Australia.
The location is approximately 250km south of East Timor and 480km northwest of Darwin. ConocoPhillips (03-12) Pty Ltd is the operator. The Ensco 104 jackup drilling rig (previously the Chiles Discovery) was on contract on the Bayu-Undan Field on 1st May, 2002 following the completion of drilling, completion and flow testing operations on the BU-WP1 platform. The rig was towed to the BU-DPP platform jacket where it was pinned on location on 23rd July, 2003. The BU-D05 well was spudded on 14th September 2003.
| FORMATION TOPS: | BU-D05 | ||||
| Formation Name | 
 (m)  | TVDRT (m)  | TVDLAT (m)  | Thickness (m)  | Comments | 
| Sea Bed | 
  | 
  | 
  | -  | |
| Oliver Formation | 
  | 
  | 
  | 
  | |
| Hibernia Formation | 
  | 
  | 
  | 
  | |
| Hibernia Marl | 
  | 
  | 
  | 
  | |
| Grebe Sandstone Member | 
  | 
  | 
  | 
  | |
| Johnson Formation | 
  | 
  | 
  | 
  | |
| Intra Johnson J1 | 
  | 
  | 
  | 
  | |
| Johnson Marl | 
  | 
  | 
  | 
  | |
| Upper Turnstone Formation | 
  | 
  | 
  | 
  | |
| Middle Turnstone Formation | 
  | 
  | 
  | 
  | |
| Lower Turnstone Formation | 
  | 
  | 
  | 
  | |
| Vee Formation | 
  | 
  | 
  | 
  | |
| Wangarlu Formation | 
  | 
  | 
  | 
  | |
| Darwin Formation | 
  | 
  | 
  | 
  | |
| Darwin Radiolarite | 
  | 
  | 
  | 
  | |
| Echuca Shoals Formation | 
  | 
  | 
  | 
  | |
| Flamingo Group | 
  | 
  | 
  | -  | |
| TOTAL DEPTH | 
  | 
  | 
  | -  | |
| FORMATION TOPS: | |||||
| BU-D05ST1 | |||||
| Formation Name | 
 (m)  | TVDRT (m)  | TVDLAT (m)  | Thickness (m)  | Comments | 
| Middle Turnstone Formation | 
  | 
  | 
  | 
  | |
| Lower Turnstone Formation | 
  | 
  | 
  | 
  | |
| Vee Formation | 
  | 
  | 
  | 
  | |
| Wangarlu Formation | 
  | 
  | 
  | 
  | |
| Darwin Formation | 
  | 
  | 
  | 
  | |
| Echuca Shoals Formation | 
  | 
  | 
  | 
  | |
| Flamingo Group | 
  | 
  | 
  | 
  | |
| Elang Formation | 
  | 
  | 
  | -  | |
| RA2.3 | 
  | 
  | 
  | 
  | |
| RA2.2 | 
  | 
  | 
  | 3.1  | |
| RA2.1 | 
  | 
  | 
  | 
  | |
| RA1.5 | 
  | 
  | 
  | 5.5  | |
| RA1.4 | 
  | 
  | 
  | 5.3  | |
| RA1.3 | 
  | 
  | 
  | 
  | |
| RA1.2 | 
  | 
  | 
  | 
  | |
| RA1.1 | 
  | 
  | 
  | 6.8  | |
| WD2.3 | 
  | 
  | 
  | 8.9  | Target T19A | 
| WD2.2 | 
  | 
  | 
  | 7.0  | |
| WD2.1 | 
  | 
  | 
  | 4.5  | |
| WD1 | 
  | 
  | 
  | 
  | |
| Plover Formation/IC4 | 
  | 
  | 
  | 1.7  | |
| IC3 | 
  | 
  | 
  | -  | |
| TOTAL DEPTH | 
  | 
  | 
  | -  | |
Drill Cuttings
(Measured depths referenced to RT 58.0 m)
Ditch cuttings spot samples for geological description were caught at 10 m intervals in the16” hole section between 844.0 and 2460 mMDRT. Composite washed and dried ditch cutting samples were collected for storage in the 12 ¼” and hole section between 2460.0 m and 4598.0 mMDRT.
A ditch cuttings sampling summary is listed in table 1.
Table 1. BU-D05 Ditch Cuttings Sampling Type and Frequency
Interval mMDRT  | Sample Frequency  | Sample Type  | Distribution  | 
137.4 to 844.0 844.0 to 2460.0 2460.0 to 4598.0  | None 10 m 10 m  | No returns Spot Samples Washed & Unwashed  | Unwashed: ConocoPhillips 1 set East Timor Gov’t 1 set Washed: ConocoPhillips 1 set East Timor Gov’t 1 set Geoscience Aust. 1 set  | 
BU-D05ST1
(Measured depths referenced to RT 58.0 m)
Composite washed and unwashed ditch cuttings samples were collected for storage at 10
and 3 m intervals in the 10 ⅝" x 12 ¼", 8 ½” and 6 ¾” hole sections, between 2461.0 and
4971.0 mMDRT.
Table 2. A ditch cuttings sampling summary.
Interval mMDRT  | Sample Frequency  | Sample Type  | Distribution  | 
| 2461.0 to 4335.0 4335.0 to 4971.0  | 10 m
 3 m  | Washed & unwashed
 Washed & Unwashed  | Unwashed: ConocoPhillips 1 set East Timor Gov’t 1 set Washed: ConocoPhillips 1 set East Timor Gov’t 1 set Geoscience Aust. 1 set  | 
Hydrocarbon Shows
Gas shows are summarized.
Cores
No conventional cores were cut.
Sidewall Cores
No sidewall cores were acquired.
LOGGING AND SURVEYS
LWD Logging
BU-D05
(Measured depths referenced to RT 58.0 m)
Sperry-sun Drilling Services ran the open hole LWD logs that are summarized.
Table 3. BU-D05 Open Hole LWD Logging Suites and Intervals
| Run | Hole Size | Tool String | Interval (mMDRT) | Comments | 
| 100 | 36.00 | No tools in hole | 137.4 - 141.4 | No MWD tools in hole | 
| 200 | 36.00 | No tools in hole | 141.4 - 173.9 | No MWD tools in hole | 
| 300 | 26.00 | DWD | 174.4 - 844.4 | Run only Directional tool | 
| 400 | 16.00 | DDS-DIR-GR | 844.4 - 1382.0 | |
| 500 | 16.00 | DDS-DIR-GR | 1382.0 - 1400.0 | |
| 600 | 16.00 | DDS-DIR-GR | 1400.0 - 1931.0 | |
| 700 | 16.00 | DDS-DIR-GR | 1931.0 - 2160.0 | |
  | 
  | 
  | 
  | |
  | 
  | 
  | 
  | End of LWD run taken as time of twist off – 23/10/04.  | 
BU-D05ST1
(Measured depths referenced to RT 58.0 m)
Sperry-Sun Drilling Services ran the open hole LWD logs that are summarised in Table 4.
Table 4. BU-D05ST1 Open Hole LWD Logging Suites and Intervals
| Run | Hole Size | Tool String | Interval (mMDRT) | Comments | 
| 1000 | 12.25  | DDS-DGR-Dir | 2461.0 - 2578.0 | |
| 1100 | 12.25  | DDS-DGR-Dir 1200 | 2578.0 - 4435.0 | |
| 1200 | 8.50  | DIR-CNP-DGRDDS- EWR-SLDACAL- BAT  | 4335.0- 4484.0 | One transceiver in ACAL tool suspected to be damaged. Calliper processed using pseudo calliper from Density tool | 
| 1300 | 8.5 | 4674.0 – 4674.0 | No tools in hole | |
| 1400 | 6.75 | DIR-RES-DGRALD- CTN  | 4674.0 - 4971.0 | 